Access procedure
|
1 500 000 TEUS |
|
|
|
Quay length |
850 meters + 200 meters for barge |
|
|
Draught at low tide |
15.50 meters |
|
|
Stacking area |
76 hectares |
|
|
Ground slots |
8 000 TEUS |
|
|
Empty blockstow |
2 400 TEUS |
|
|
Reefer sockets |
450 |
|
|
Over-panamax cranes |
10 |
|
|
Container carriers |
22 |
|
|
Tandem lift 40’ |
|
|
|
Productivity per crane |
24 |
|
|
Railway facilities - Railways - RMG
Stuffing / destuffing centre - Stacking area |
4 150 meters 3
2 hectares |
|
|
Yard equipment - 55 girders 4 heights - DGPS
|
Multimodal distribution - by road : 83,3% - by barge : 6,30% - by rail : 10,4% |
|
Mean waiting time per lorry : 48 minutes Mean containers per lorry : 1,5 Transhipment : 27% |
||